Srpske NovineSrpske Novine

Vucic in Raca: Jumko Stays, Road to Spa Costs 3.2 Million

President Aleksandar Vucic toured Toplica District and announced that the Jumko plant in Raca stays open, with new machines and higher wages, while the road to Kursumlijska Banja opens in November.

Milan Stanković3 min read0
Podeli
President Aleksandar Vucic during a visit to the Toplica District on August 19
President Aleksandar Vucic touring the Toplica District, August 19, 2026./ Photo: Resetka

Serbian President Aleksandar Vucic toured the Toplica District today, telling workers at the Jumko plant in Raca Kursumlijska, near Kursumlija, that the factory stays open and that the state is preparing new machines and higher wages for its staff. The visit began at 9 a.m. with the Jumko stop and continued through the day with stops in Kursumlija, Blace and Prokuplje.

Jumko gets new machines, employee count in dispute

At the Jumko plant, which produces uniforms and specialized clothing for the army, police and other state bodies, Vucic told workers the plant would not be shut down. Economy Minister Adrijana Mesarovic accompanied the president on the visit, and Vucic called on the Post, Telekom, Srbijasume and other state-owned systems to start sourcing their uniforms from Jumko.

“The Jumko plant in Raca Kursumlijska will not be shut down,” Vucic said at the factory.

The president announced that a new machine, including a fabric layer and a double-needle machine, would be delivered within two weeks, along with the hiring of about ten more workers. He told the women working at the plant that wages would get special attention.

“We will make sure your wages go up, not just to the minimum,” Vucic told the Jumko workers.

Sources differ on how many people the plant employs. Informer reports 34 women and six men currently working there, while Resetka puts the number at 42 employees, 36 women and six men.

Road to Kursumlijska Banja due by November

At 9:40 a.m. the president inspected work on the Rudare-Ljusa-Kursumlijska Banja road. The stretch is 7.5 kilometers long and six meters wide, worth 3.2 million euros, with completion announced for November of this year.

The program continued at 10:20 a.m. with a visit to the new emergency department building at the Kursumlija Health Center, and at 10:55 a.m. with an inspection of work on the third phase of a complex combat systems factory in the same town.

Blace and Prokuplje in the afternoon

From Kursumlija the visit moved to Blace, where at 11:40 a.m. the president visited the Veljic family household, followed at 12:15 p.m. by a stop at the MI-MI family distillery. The program then shifted to Prokuplje in the afternoon, with a visit to work on the Carolija kindergarten at 1:45 p.m., the SZR Kesa plastic packaging plant at 2:30 p.m. and the Filipovic family at 3:05 p.m., closing out the official schedule for the day.

Schools need 6.5 million euros

According to announcements made during the visit, a full overhaul of the Drinka Pavlovic and Miloje Zakic elementary schools in Kursumlija would require about 6.5 million euros. At the branch of Drinka Pavlovic school, which is attended by 28 students, officials also announced that windows and doors would be replaced.

During their conversation with the president, local residents also asked for aging wooden power poles to be replaced with concrete ones, and were told the request would be met.

Kursumlija wages rise from 202 to about 900 euros

As a sign of the municipality’s economic progress, officials cited during the visit that the average wage in Kursumlija stood at 202 euros in 2012, compared to about 900 euros today.

The president also announced the construction of a new hotel in Lukovska Banja and continued work on road infrastructure toward Merdare, which, according to officials on the ground, would give the Toplica District an added tourism and transport link to the north of Kosovo and Metohija.

The concrete deadlines set out during the visit, first two weeks for the new Jumko machines, then November for the road to Kursumlijska Banja, will provide the first measurable test of what the president promised on the ground today.

Podeli
Komentari…
Next storyKadinjaca Tunnel Gets a Start Date: Work Begins October 1Serbia's president announced in Zlatibor that work on the Kadinjaca tunnel begins October 1, while the Zlatibor bypass costs between 22 and 23 million euros, of which seven have been paid.

From other sections

Most read today

  1. Greece vs Serbia: Zivkovic and Dragojevic Out in Volos
  2. Stevandic re-elected Republika Srpska parliament speaker
  3. Student List to Elect Assembly Speaker by Majority Vote
  4. Air Serbia Bars Montenegrin Fans From Larnaca Flight
  5. GENGE map shows 125,054 active Serbian business entities

Komentari (0)

Ostavi komentar

Komentari prolaze kratku moderaciju. Lični napadi i govor mržnje se brišu.

Još nema komentara. Budi prvi i podeli mišljenje.